In short
How does an order of shisha briquettes run, and when do I pay?
A first order starts with a 50% deposit and pays the balance before stuffing; repeat orders pay 10% down and the balance after arrival. Between the payments run 21–25 days of production, 14 days of weathering and about 14 days from packing to on board. For a container of shisha briquettes, the bill of lading goes out as a telex release after the balance is paid.
Pages in this section
-
Price list and how a price is built
Each grade has two prices, full packaging and bulk, in US dollars per metric ton, FOB Semarang, for a 40 ft container.
-
EXW, FOB or CIF from Semarang
The factory quotes EXW at its gate and FOB or CIF from Semarang; under FOB and CIF, risk passes on board.
-
Samples before the first container
Samples of 1 to 10 kg are free and leave the factory the next working day; the buyer pays the courier.
-
Claims and the retained sample
Quantity claims have one week and quality claims two weeks, counted from the day the container reaches the buyer's warehouse.
1. The order, step by step
An order runs in eight steps, and two payments frame the work. The times are the factory's declared ones.
-
Quote
You send the quote form; the factory replies with a written quote by email.
-
Sample
If you want to test first, samples of 1–10 kg are free and leave the next working day.
-
Proforma and deposit
The proforma invoice is made out to your company, and the deposit starts production. First order: a 50% deposit; the balance before stuffing.
-
Production 21 days (20 ft) · 21–25 days (40 ft)
The briquettes are pressed and dried for your order; the factory produces to order and keeps no stock.
-
Weathering 14 days
The unpacked briquettes rest under cover in the open air before packing, as the rules for this cargo require.
-
Packing and loading about 14 days to on board
The briquettes are packed, the container is loaded and inspected, and it goes to the port.
-
Balance
The balance is paid on the terms of your order, before stuffing on a first order and after arrival on a repeat order.
-
Telex release
Once the balance is paid, the bill of lading is released by telex.
2. Payment
The terms differ between the first order and the ones after it.
- First order: a 50% deposit; the balance before stuffing.
- Repeat orders: from the second order: a 10% deposit; the balance after arrival.
- When a buyer asks: payment by letter of credit is accepted.
- Account holder: PT Nargile Coconut Charcoal Indonesia.
Important
Pay only to an account held by the company named on this site, and check any change of bank details through the contact form before you pay.
3. The lead time
A 20 ft container takes 21 days to produce and a 40 ft 21–25 days; weathering adds 14 days, and packing to on board about 14 days more. From the deposit to the container on board that is about 49 (computed from 21 days of production, 14 days of weathering and 14 days between packing and on board) days for a 20 ft container, and 49 to 53 (computed from 21–25 days of production, 14 days of weathering and 14 days between packing and on board) days for a 40 ft.
The weathering is not the factory's choice: the rules for this cargo set it.
Unless the competent authority approves otherwise, special provision 978 requires the unpacked material to be weathered, stored under cover but in the open air, for at least 14 days after production before it is packed; the alternative is steam and cooling after pyrolysis, packing under an inert gas such as nitrogen, and at least 24 hours under loose cover or in the open air before transport.
Source: Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization, opened
A box printed with your brand adds its printing time before production, as set out on print time for a branded box.
After loading, sailing from Semarang takes about 16 to 45 days to the ports the factory gives, by its own estimate. Each port's figure is on the country pages, and the quote states the transit time of your booking.
4. Weekly updates
While the order runs, the buyer receives weekly updates on production, packing, quality checks and stuffing, every Monday; photographs of the empty container before loading and of the load.
An independent surveyor inspects the load before shipment and issues the vanning certificate; the factory pays for it inside the FOB price. The loads and how the container is packed are on container loads.
5. Documents and release
The papers come in draft first, and the bill of lading comes last: a telex release once the balance is paid; every document draft goes to the buyer for checking first.
Definition
telex release
A telex release is the carrier's release of the cargo to the consignee without the original bill of lading, on the shipper's instruction.
The full set, from the lab report to the bill of lading, is on the export documents; what the bill names and when it is released, order by order, is on the bill of lading.
6. Samples first
A first container can start with a sample. Samples of 1–10 kg are free, the courier paid by the buyer, and they leave the next working day.
The sample terms and the courier rules are on samples.
7. Price and delivery terms
The price comes from the dated list or the quote, on the delivery term you choose: EXW, FOB or CIF, the last two from Semarang.
- How a price is built and the dated list: price list and how a price is built.
- What each delivery term covers: EXW, FOB or CIF.
- The first step of an order: request a quote.
Questions buyers ask
How long does it take from the deposit to the container on board?
When is the balance paid on a repeat order?