In short
When is the bill of lading for my container released, and what do I check before it is issued?
The factory releases the bill of lading by telex once the balance is paid, after the buyer has checked every document draft. A first order pays the balance before stuffing, so its release can follow the bill at once; from the second order the release follows the balance after arrival.
1. What a bill of lading records
Definition
bill of lading
A bill of lading is the paper a carrier signs for cargo loaded on board, naming the shipper, the consignee and the ports of loading and discharge.
The carrier issues the bill for a container of shisha briquettes once the container is on board at Semarang. What happens before that, from the empty container to the seal, is on loading day, before the bill is issued.
- The shipper, the consignee and the notify party.
- The ship, with the ports of loading and of discharge.
- The container and seal numbers.
- The description of the cargo.
The shipper named on the factory's bills is the factory itself, not a forwarder.
Until the bill exists, the buyer follows the order through the factory's weekly updates on production, packing, quality checks and stuffing, every Monday; photographs of the empty container before loading and of the load.
2. Checking the draft
Every document draft goes to the buyer for checking first. The draft of the bill of lading is one of them, and it is checked before the carrier issues the bill.
Definition
consignee
A consignee is the person or company named on a bill of lading to take delivery of the cargo at the port of discharge.
Definition
notify party
A notify party is the person or company named on a bill of lading whom the carrier tells when the cargo arrives.
| On the draft | Check it against |
|---|---|
| Consignee | The company that takes delivery, as the importer names it |
| Notify party | Whom the carrier informs on arrival, as the importer names it |
| Port of discharge | The port named in the quote |
| Cargo description | The dangerous goods declaration |
| Container and seal numbers | The container as sealed on loading day |
The cargo description follows the dangerous goods declaration; how that paper reads, line by line, is on the dangerous goods declaration.
3. The telex release
The factory's bill of lading goes out as a telex release once the balance is paid. A telex release lets the consignee take the container without an original bill travelling to the buyer first.
The release is sent the next working day after the balance arrives, as a rule.
Note
When a buyer asks, original bills of lading or a sea waybill can be issued instead of a telex release, and payment by letter of credit is accepted. Ask for either in the quote.
4. When the release comes, by order
The release follows the balance, and the balance falls at a different point on a first order and on a repeat order.
| Order | Deposit | Balance | Telex release |
|---|---|---|---|
| First order | A 50% deposit | The balance before stuffing | Once the bill is issued |
| Repeat orders | A 10% deposit | The balance after arrival | Once the balance is paid |
The whole sequence, from the quote to the release, with the time each step takes, is on how an order runs.
5. At the port of discharge
Once the carrier has the release, the consignee takes the container at the port of discharge.
Four destinations name their ports on pages of their own: a release at a Canadian port, a release at Aqaba, a release at Beirut and a release at Hamburg. Every destination is on what changes by country.