In short
How does a container of shisha briquettes reach Canada, and what will the quote need?
The factory quotes containers for Canada FOB Semarang or CIF to the Canadian port the importer names, such as Vancouver, Montreal or Halifax. The shisha briquettes travel as UN 1361, Class 4.2, with the factory's papers; the import rules are the importer's to confirm. The carrier reports the cargo data to Canadian customs 24 hours before the container is loaded at Semarang.
1. The port of discharge in Canada
The importer names the port of discharge; Vancouver, Montreal or Halifax are named here as examples of where a container to Canada is taken off the vessel. The port of discharge goes on the quote form and, later, on the bill of lading.
- The port of discharge, as the importer names it.
- The consignee, the company that takes delivery.
- The notify party, whom the carrier informs when the container arrives.
Montreal and Vancouver are ports the factory has shipped containers to.
The carrier confirms the port for a Class 4.2 container when the booking is made.
2. The papers for a container to Canada
The factory sends its own set of papers with every container, whatever the destination. The certificate of origin is issued in the form Canada requires.
| Document | Note |
|---|---|
| Lab report | available; one per order |
| Safety data sheet | available |
| Self-heating test report | available (UN N.4 test) |
| Weathering certificate | Issued by the factory for each container |
| Vanning certificate | Issued by an independent surveyor after inspecting the load |
| Dangerous goods declaration | Signed by the consignor |
| Certificate of origin | Issued in Indonesia, in the form Canada requires |
| Bill of lading | A telex release after the balance is paid |
Note
What Canada asks for at import is the importer's to confirm with its own customs broker. This page states none of it until it has been checked at the publisher. Each paper of the set is explained on the factory's papers, which certificate of origin goes with which destination on the certificate of origin, and when the bill of lading is released on the bill of lading.
3. Booking a container to Canada
A container to Canada is booked as dangerous goods only. Two lines set what the carrier asks of it in Indonesia.
For bookings made or amended from 1 October 2025, Maersk in Indonesia accepts charcoal only as dangerous goods under UN 1361, Class 4.2, from shippers it has audited in advance, and every charcoal booking needs Maersk's loading acceptance.
Source: Export: local information, Indonesia (opens in a new tab), Maersk, opened
Maersk in Indonesia asks for the documents of sensitive cargo, charcoal included, at least 96 hours before the vessel's estimated arrival or berthing.
Source: Export: local information, Indonesia (opens in a new tab), Maersk, opened
A container for Canada also has a deadline on the carrier's side, its report of the cargo data to the Canada Border Services Agency, stated here as the agency's memorandum gives it.
For containerized cargo bound for Canada by sea and loaded outside the United States, the carrier, or a service provider it authorizes, transmits the primary cargo data electronically to the Canada Border Services Agency 24 hours before the cargo is loaded at the foreign port.
Source: Memorandum D3-5-1, Marine Pre-load/Pre-arrival and Reporting Requirements (opens in a new tab), Canada Border Services Agency, opened
The factory asks for the consignee and notify details 2 to 3 days before loading, so that the carrier has the cargo data in time.
Sailing from Semarang to Vancouver takes about 45 days, as the factory gives it; the transit time of your booking is stated in the quote. How carriers take a booking of this cargo is on booking with a carrier.
4. A CIF quote to a Canadian port
A CIF quote to a Canadian port needs five answers, and the quote form asks for each.
- The port of discharge.
- The container: 20 ft or 40 ft.
- The size, from the six standard sizes or a shape made on request.
- The grade: Platinum, Super Premium or Premium.
- The packing: the inner pack, the master carton and a neutral or printed box.
Under the ICC's CIF rule, the seller delivers the goods on board at the port of shipment, where the risk passes to the buyer, and pays the freight and an insurance cover for the buyer to the named port of destination; the default cover is the Institute Cargo Clauses (C), and the parties may agree a higher one.
Source: CFR & CIF Incoterms® 2020 explained: Key differences (opens in a new tab), ICC Academy, International Chamber of Commerce, opened
What CIF leaves to the buyer, set against FOB and EXW, is on what CIF covers. CFR and FCA Semarang are quoted on request as well.
5. The price list and your quote
The factory's dated price list is the same for every destination: FOB Semarang, for a 40 ft container. A CIF price to your port comes in the quote.
| Grade | Full packaging | Bulk |
|---|---|---|
| Platinum | USD 1,850 | USD 1,800 |
| Super Premium | USD 1,750 | USD 1,700 |
| Premium | USD 1,650 | USD 1,600 |
Full packaging: 1 kg boxes in master cartons; the price is for neutral boxes. Bulk: 1 kg plastic bags without a box, in master cartons. Only the standard cubes (25 mm, 26 mm, 27 mm and 28 mm) are on the list; other shapes and boxes printed with the buyer's brand are priced in the quote. Each price is for one metric ton on board at the port of Semarang, before sea freight, insurance and import charges. The price of your order is the one written in your quote and on its proforma invoice.
How a price is built, layer by layer, is set out on the price page.
The quote form opens with Canada filled in: request a quote for Canada. How a price is built is on the price list, and the neighbouring country page is Germany.
Questions buyers ask
Which papers does Canada ask for at import?
When does the carrier report a container for Canada?
Sources
- Export: local information, Indonesia (opens in a new tab), Maersk — opened
- Memorandum D3-5-1, Marine Pre-load/Pre-arrival and Reporting Requirements (opens in a new tab), Canada Border Services Agency — opened
- CFR & CIF Incoterms® 2020 explained: Key differences (opens in a new tab), ICC Academy, International Chamber of Commerce — opened