Loading day: from empty container to seal

Loading day closes production: the container of shisha briquettes is lined, loaded, inspected and sealed before it sails. This page follows the day in order, with the rule behind each step and the papers you hold when the shisha charcoal leaves.

Published by
PT Nargile Coconut Charcoal Indonesia
Published
Updated
Kraft paper laid on a container floor keeps the cartons off the bare floor.

In short

What happens on the day my container is loaded, and what do I receive afterwards?

Loading day runs in a fixed order, from photographs of the empty container to the seal on its doors. Kraft paper and dry bags go in first, the load leaves 30 cm free at the top, and an independent surveyor inspects it. The shipper gives the carrier the verified gross mass before loading. The buyer receives the photographs, the vanning certificate and the document drafts.

1. Before loading day

Two rules of the carriage set when a container can be packed, and the carrier sets when its papers are due.

Unless the competent authority approves otherwise, special provision 978 requires the unpacked material to be weathered, stored under cover but in the open air, for at least 14 days after production before it is packed; the alternative is steam and cooling after pyrolysis, packing under an inert gas such as nitrogen, and at least 24 hours under loose cover or in the open air before transport.

Source: Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization, opened

Special provision 978 allows the material to be packed only when its temperature does not exceed 40 °C on the day of packing.

Source: Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization, opened

The factory weathers for 14 days and records the production date, the packing date and the packing-day temperature on the weathering certificate: see the weathering certificate. Its own packing limit is the day's temperature plus 5 °C, and 40 °C at most. The weathering rule is the same for every container.

Maersk in Indonesia asks for the documents of sensitive cargo, charcoal included, at least 96 hours before the vessel's estimated arrival or berthing.

Source: Export: local information, Indonesia (opens in a new tab), Maersk, opened

2. The empty container

Loading happens at the factory in Tempuran, and nowhere else. The day runs in five steps, from the empty container to the weight the carrier needs.

  1. The empty container

    Photographed before loading, then lined with kraft paper on the floor and fitted with dry bags on the side walls.

  2. The load

    The cartons go in, floor-loaded or on pallets, with 30 cm left free at the top.

  3. The inspection

    An independent surveyor inspects the load and issues the vanning certificate.

  4. The seal

    The load is photographed, and the container is closed and sealed.

  5. The weight

    The loaded container is weighed on a weighbridge, and the shipper gives the carrier the verified gross mass before the container is loaded onto the ship.

The empty container is photographed before anything goes in, and the photographs reach the buyer.

It is then lined and fitted: kraft paper on the container floor; 1 kg dry bags hung on the side walls, 6 in a 20 ft and 10 in a 40 ft. Each dry bag hangs on a side wall; why they are there is on kraft paper and dry bags.

Dry bags hung inside a container take up moisture from the air during the voyage.

3. The load

The cartons go in floor-loaded or as a palletized load, as the order states; the tons each way are on pallets or floor.

The load leaves 30 cm free at the top, the headspace the rule for this cargo asks for:

Special provision 978 requires at least 30 cm of headspace when the packages are stowed in a container, and calls for a stowage height of no more than 1.5 m, or blocks of no more than 16 m³ with at least 15 cm between them.

Source: Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization, opened

Cartons stacked below the roof line leave room for air to move above the cargo.

The rule in full, with its other conditions, is on the headspace and stowage rule.

4. Inspection and seal

An independent surveyor inspects the load before shipment and issues the vanning certificate; the factory pays for it inside the FOB price. The vanning certificate is explained on the vanning certificate.

Whoever packs the container also certifies the packing, under the dangerous goods rules for UN 1361, in a container packing certificate:

Whoever packs dangerous goods into a container provides a container packing certificate that names the container and certifies, among other points, that it was clean, dry and fit for the goods, that only sound packages were loaded, that the container and packages are marked, labeled and placarded, and that a dangerous goods transport document was received for each consignment.

Source: Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization, opened

Here it is signed by the factory's shipping coordinator.

Then the doors are sealed, as the rule for this cargo in containers states:

For UN 1361 in containers, the IMDG Code requires the doors and other openings to be sealed after packing, the hold temperature to be read and recorded once a day early in the morning during the voyage, and the cargo to be stowed away from sources of heat.

Source: Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization, opened

A seal on the container doors shows whether they have been opened since loading.

5. The verified gross mass

Definition

verified gross mass

The verified gross mass is the weight of a packed container, its cargo and packing included, that the shipper confirms before the container is loaded onto a ship.

Before a packed container goes onto the ship, the carrier must have its weight, verified by the shipper:

Under SOLAS regulation VI/2, in force since 1 July 2016, the shipper is responsible for the verified gross mass of a packed container: it is obtained by weighing the packed container, or by weighing all packages and cargo items and adding the container's tare mass by a certified method, and it is stated in a shipping document sent early enough for the ship's stowage plan. The verified gross mass is a condition for loading the container onto the ship.

Source: Verification of the gross mass of a packed container (opens in a new tab), International Maritime Organization, opened

Note

The shipper is the factory itself, not a forwarder, and the loaded container is weighed on a weighbridge.

6. What you receive

At the end of the day the buyer holds a record of the loading, and the papers follow.

  • The update: weekly updates on production, packing, quality checks and stuffing, every Monday; photographs of the empty container before loading and of the load.
  • The vanning certificate, with the factory's document set.
  • Every document draft goes to the buyer for checking first.

From packing to on board takes 14 days. Where loading day falls among the steps of an order is on how an order runs.

Questions buyers ask

What do I receive after my container is loaded?
You receive weekly updates on production, packing, quality checks and stuffing, every Monday; photographs of the empty container before loading and of the load, and the vanning certificate with the factory's papers.
Why must a container's weight be verified before it is loaded?
Under SOLAS regulation VI/2, in force since 1 July 2016, the shipper is responsible for the verified gross mass of a packed container: it is obtained by weighing the packed container, or by weighing all packages and cargo items and adding the container's tare mass by a certified method, and it is stated in a shipping document sent early enough for the ship's stowage plan. The verified gross mass is a condition for loading the container onto the ship.

Sources

  1. Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization — opened
  2. Export: local information, Indonesia (opens in a new tab), Maersk — opened
  3. Verification of the gross mass of a packed container (opens in a new tab), International Maritime Organization — opened