In short
Who inspects my container before it sails, and what does the vanning certificate tell me?
An independent surveyor inspects the load before shipment and issues the vanning certificate; the factory pays for it inside the FOB price. It is not the container packing certificate, which whoever packs dangerous goods into a container must provide under the IMDG Code. The vanning certificate comes with the factory's document set.
1. What the vanning certificate is
An independent surveyor inspects the load before shipment and issues the vanning certificate. The vanning certificate is that surveyor's record of what was loaded.
The surveyor is named here, with the items its certificate lists, once the factory's own copy of a vanning certificate is on file.
2. Who pays for the survey
The factory pays for it inside the FOB price. The buyer does not pay a separate surveyor's fee on an FOB order.
What the FOB price includes, set against CIF and EXW, is on what FOB includes.
3. Two certificates, two purposes
Definition
container packing certificate
A container packing certificate is the statement by whoever packs dangerous goods into a container that the container was fit for them and was packed, marked and placarded as required.
Two certificates concern the same load, for two different purposes. The table sets them side by side.
| Point | Vanning certificate | Container packing certificate |
|---|---|---|
| Made by | An independent surveyor | Whoever packs the dangerous goods into the container |
| What it covers | The surveyor's inspection of the load before shipment | That the container was fit, packed, marked and placarded as required |
| Rule behind it | The factory's declared practice | The IMDG Code |
Whoever packs dangerous goods into a container provides a container packing certificate that names the container and certifies, among other points, that it was clean, dry and fit for the goods, that only sound packages were loaded, that the container and packages are marked, labeled and placarded, and that a dangerous goods transport document was received for each consignment.
Source: Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization, opened
The dangerous goods papers of the container, the dangerous goods declaration first, are on the dangerous goods declaration.
4. With the photographs of the load
The buyer also receives weekly updates on production, packing, quality checks and stuffing, every Monday; photographs of the empty container before loading and of the load. With the surveyor's certificate, they show the container before and after it was loaded.
The weight the carrier needs, the verified gross mass, is a separate matter again; the whole day is on loading day.
5. Getting the vanning certificate
The vanning certificate comes with the factory's document set; every document draft goes to the buyer for checking first.
Note
By the factory's answer, a buyer may appoint its own surveyor, and the buyer pays for that surveyor. Every paper of the set is on the document set.
Questions buyers ask
Who pays for the surveyor who inspects the load?
Is the vanning certificate a dangerous goods document?
Sources
- Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization — opened