Skip to the content
Menu

Dated ledger · Dangerous Goods

Shipping lines that carry the shisha briquettes

A container of shisha briquettes, or hookah coals, sails as dangerous goods under UN 1361, Class 4.2, and a container line may set conditions of its own on top. This page puts the lines that have carried the factory's containers beside their own notices on charcoal, each dated and checked at the line.

Published by
PT Nargile Coconut Charcoal Indonesia
Published
Updated

In short

Which container lines carry the factory's shisha briquettes, and what does each one ask for?

Maersk, MSC, CMA CGM and RCL carry charcoal as dangerous goods, UN 1361, and Maersk and CMA CGM only from shippers they have approved. The page lists the container lines that have carried the factory's containers, as the factory names them, and gives each checked line's own notice with two dates: the notice's and the day it was last opened.

1. The lines that have carried the factory's containers

MSC, CMA CGM, Maersk, OSL, PIL and RCL have carried the factory's containers, as the factory names them. The page gives no dates, counts or routes for them, and states no approval or contract with any of them.

Definition

container line

A container line is a shipping company that runs scheduled services with container ships and sets its own conditions for the cargo it books, within the dangerous goods rules of the IMDG Code.

The line is chosen by whoever books the container. Under FOB your forwarder books it, so it may be a line not named here; under CIF the factory books it. What each term leaves to you is on who books the line under each term.

2. What each line's notice says

Each row is one line's own notice on charcoal, opened at the line, with the date the notice gives and the day it was last checked.

What each container line has published about carrying charcoal: the line's own notice, the date the notice gives, the day this site last opened it at the line, and its source. A row leaves the table when its notice has not been opened again for 45 days.
LineWhat its notice saysNotice dateChecked onSource
MSC MSC has applied the charcoal requirements of IMDG Amendment 42-24 on a mandatory basis since 1 November 2025, two months before the amendment's general entry into force.2 October 20252026-11-21 IMDG 42-24: Regulatory Changes to the Transportation of Charcoal (Carbon) (opens in a new tab)
CMA CGM Since 1 August 2023, CMA CGM in Indonesia has taken charcoal of Indonesian origin only as dangerous goods, on vessels operated by the CMA CGM Group and only from shippers its cargo safety department has approved, under its conditions for weathering, packaging, packing, the vanning survey and the container's stowage.4 August 20232026-11-24 Indonesia: Charcoal Acceptance (opens in a new tab)
CMA CGM From 1 June 2025, CMA CGM Group vessels carry charcoal under IMDG Amendment 42-24 as dangerous goods with no exemption: weathered for at least 14 days before packing, no warmer than 40°C on the day of packing, in UN-approved packaging, with a dangerous goods declaration, a weathering certificate and a vanning survey, and with at least 30 cm left free at the top of the container.Rules applicable from 1 June 20252026-11-24 Shipping Carbon / Charcoal on CMA CGM Group vessels (opens in a new tab)
Maersk From 1 October 2025, Maersk in Indonesia takes charcoal only as dangerous goods under UN 1361, Class 4.2, and only from shippers it has audited in advance; the booking carries a safety data sheet, a company profile, a draft weathering record and a preliminary dangerous goods declaration, and the vanning and packing certificates follow before the container enters the terminal.23 September 20252026-11-24 Charcoal to DG Shipments Update Advisory (opens in a new tab)
RCL RCL's list of prohibited and restricted dangerous goods sets conditions for UN 1361 charcoal: it travels only on vessels RCL owns, under an RCL bill of lading, with the approval of RCL's regulatory and dangerous goods teams, a vanning survey, a photo record and inspection of the container, and the shipper's weathering report showing at least 14 days of cooling before packing.13 January 20262026-11-24 Dangerous Goods Prohibited and Restricted Cargo List (opens in a new tab)

A line named above gets a row only once its own notice is opened at the line; until then this page states nothing about its conditions.

3. How the table is kept

Every row's notice is opened again at the line once a month, and the day of that check is the date in the row. A row whose notice has not been opened for 45 days leaves the table at the next build, so an old condition never shows as current.

A notice that changes is rewritten with its new date, and one that no longer holds is taken off. How the site verifies and dates each line is set out in how a line is verified and dated, and the changes themselves are dated on the rule changes log.

4. Before you book a line

Three papers recur in the lines' notices: the dangerous goods declaration, the weathering certificate and the vanning certificate. The factory supplies each with the container:

  • The declaration: signed by the factory itself, as the shipper. More on the declaration.
  • The weathering record: a weathering certificate is issued under the shipping coordinator; for each container it records the production date, the packing date and the temperature on the day of packing. More on the weathering certificate.
  • The vanning survey: an independent surveyor inspects the load before shipment and issues the vanning certificate; the factory pays for it inside the FOB price. More on the vanning certificate.

Behind the recent notices is one change to the dangerous goods code:

Amendment 42-24 to the IMDG Code, adopted by IMO resolution MSC.556(108) on 23 May 2024, entered into force on 1 January 2026; governments could apply it voluntarily from 1 January 2025.

Source: Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization, opened

What a booking needs on the day, from the line's acceptance to its document deadline, is on booking with a carrier.

Questions buyers ask

Can I choose the line for my container?
Under FOB your forwarder books the line, so its conditions are the ones to check; under CIF the factory books it. The factory quotes EXW, FOB or CIF.
Why does a line the factory names have no row?
A line gets a row only when its own notice on charcoal has been opened at the line in the last 45 days. Until then the page names the line and states nothing about its conditions.
How old can a row be?
At most 45 days from the day its notice was last opened at the line; each row shows that day. A row that has not been checked for longer leaves the table at the next build.

Sources

  1. IMDG 42-24: Regulatory Changes to the Transportation of Charcoal (Carbon) (opens in a new tab), MSC Mediterranean Shipping Company — opened
  2. Indonesia: Charcoal Acceptance (opens in a new tab), CMA CGM — opened
  3. Shipping Carbon / Charcoal on CMA CGM Group vessels (opens in a new tab), CMA CGM — opened
  4. Charcoal to DG Shipments Update Advisory (opens in a new tab), Maersk — opened
  5. Dangerous Goods Prohibited and Restricted Cargo List (opens in a new tab), RCL (Regional Container Lines) — opened
  6. Resolution MSC.556(108): Amendments to the International Maritime Dangerous Goods (IMDG) Code, Amendment 42-24 (opens in a new tab), International Maritime Organization — opened

Get a quote with the port of loading on it

The quote form takes your port and your delivery term; the reply covers the papers that go with the booking.

Request a quote