In short
What happens after the container arrives, and what has to be done before the claim windows close?
Telex release follows the balance, and the claim windows open when the container reaches your warehouse: count the cartons and test pieces first. Quantity claims have one week and quality claims two weeks from that day, so the devanning belongs in the first days. Stored as the factory advises, the shisha briquettes keep up to 5 years in unopened cartons.
1. The release at the port
The telex release is sent the next working day after the balance arrives, as a rule. When the balance is due depends on the order:
- First order: a 50% deposit; the balance before stuffing.
- From the second order: a 10% deposit; the balance after arrival.
On a repeat order, then, the release follows a payment made after the container has arrived, so send the payment as soon as the carrier's arrival notice comes. Every document draft goes to the buyer for checking first. How the bill of lading is drafted, checked and released is on the bill of lading and its release.
2. Opening the container
Definition
devanning
Devanning is the unloading of cargo from a shipping container at the end of its journey, the reverse of stuffing it.
Besides the cartons, the container holds what the factory put in against moisture: kraft paper on the container floor; 1 kg dry bags hung on the side walls, 6 in a 20 ft and 10 in a 40 ft. Photograph the kraft paper and each dry bag as they are found, before anything is unloaded. How the factory keeps moisture out at each layer is on keeping moisture out.
The factory sends photographs of the empty container before loading and of the load, so the load as found can be set beside the load as it left. How they are taken is on the photographs of the load.
What to record before unloading, from the seal to the count of cartons, is listed on what to record when the container is opened.
3. The first two weeks at your warehouse
Both claim windows are counted from the day the container reaches the buyer's warehouse: one week for quantity and two weeks for quality.
- Count the cartons against your order within the first week.
- Test pieces from cartons taken across the load within the two weeks.
At the factory, each piece is inspected by hand as it is packed. The burn test and the drop test the factory runs can be repeated on your pieces, as set out on testing pieces yourself.
A quality claim is checked against the retained sample the factory keeps from your batch. How a claim is made and settled is on claims and the retained sample.
Note
Damage that happens in transit is a different matter from a claim on the batch: who carries that risk depends on the delivery term, as set out on who carries the risk under each term. Questions about a container that has arrived go to Raka Mahendra (Export Department Head) through the contact form.
4. Storing the cartons
The cartons arrive with a plastic bag in every master carton; a PVC shrink wrap around each carton is available on request.
The factory advises storing the cartons in a covered warehouse, on pallets, out of direct sunlight and away from water, humidity and fire, at the surrounding temperature, with no heating or cooling needed.
The factory's safety data sheet sets out handling and storage in full, under a heading of their own. The sheet is available on request, and how to read it is on the safety data sheet.
Note
Shelf life in unopened cartons: up to 5 years