In short
What does the factory check, at which step, and what makes it reject a batch?
Six checks run in production order, from the shell charcoal on arrival to a hand check of every piece at packing. Between them come size four times a day, moisture after every oven load, a burn test and a drop test. A batch fails on smell or smoke as the pieces warm up, high ash, cracked or broken pieces or pieces of uneven size or density.
1. The checks in production order
Six checks run in the order of production. The table gives what each one checks and how, as the factory declares it.
| Check | What is checked | How |
|---|---|---|
| On arrival | The shell charcoal | moisture under 12%, at least 82% fixed carbon, at most 14% volatile matter, the ash content and the color of the ash |
| Size | The pressed pieces | four times a day, 20 pieces go under a digital caliper and each reading is logged |
| Drying | Every oven load | 48 hours or more per batch; moisture measured with a meter on every oven load; 2% at most |
| Burn test | Pieces of the batch | three pieces go on an electric coil; the time each takes to light and how long it burns are logged |
| Drop test | Lit pieces | a lit piece is dropped on a hard tiled floor, from 30 cm for hexagonal, dome and finger shapes and from 100 cm for cube and flat shapes; it passes if it stays whole after three drops |
| Packing | Every piece | Each piece is inspected by hand as it is packed |
Every limit behind these checks is in one table on the limit behind each check.
2. On arrival
The shell charcoal is checked on arrival for moisture under 12%, at least 82% fixed carbon, at most 14% volatile matter, the ash content and the color of the ash.
These are the raw material's limits: moisture content, fixed carbon, volatile matter and ash content, with the color of the ash looked at as well.
3. During production
Four checks run while the pieces are made: the size, the moisture after drying, and two tests on lit pieces.
- Size: four times a day, 20 pieces go under a digital caliper and each reading is logged; the size tolerance is ±0.3 mm per side.
- Moisture: 48 hours or more per batch; moisture measured with a meter on every oven load; 2% at most.
- The burn test: three pieces go on an electric coil; the time each takes to light and how long it burns are logged.
- The drop test: a lit piece is dropped on a hard tiled floor, from 30 cm for hexagonal, dome and finger shapes and from 100 cm for cube and flat shapes; it passes if it stays whole after three drops.
Three of these checks can be repeated on a sample: see testing a sample the same way.
4. At packing
Each piece is inspected by hand as it is packed. It is the last of the six checks.
How the pieces come to the packing table, from the press to the ovens, is on the production steps.
5. What fails a batch
Definition
batch
A batch is the quantity of briquettes pressed and dried together and checked as one unit.
Four signs fail a batch, and a batch that fails is set aside; it is not ground and pressed again.
- Smell or smoke as the pieces warm up
- High ash
- Cracked or broken pieces
- Pieces of uneven size or density
High ash is judged against the grade's range, as each order's lab report gives it: see the lab report of each order.
6. Records and the retained sample
The records of the checks are kept by the shipping coordinator, under Yudha Prakoso (Logistics Manager). The buyer receives weekly updates on production, packing, quality checks and stuffing, every Monday; photographs of the empty container before loading and of the load.
The factory keeps about 25 kg of every batch for 5 years, sealed in bags marked with the batch number and date. This retained sample is what a quality claim is checked against.
Note
A claim is made for quantity within one week and for quality within two weeks, counted from the day the container reaches the buyer's warehouse; the buyer's report is checked against the retained sample; a claim that holds is settled with a credit on the next order; the decision can go to a laboratory or a surveyor, and the cost is shared. How a claim runs is on a claim against the retained sample.